25 C
Lucknow
Online Latest News Hindi News , Bollywood News

National Highways in Gujarat

Uncategorized

New Delhi: The Government has notified the road from Beyt Dwarka connecting Okha to Dwarka as extension of National Highway 51 in the state of Gujarat on 21st July 2017.  Besides, the road sections namely Adhelai-Nari Junction (SH-6), Dwarka-Khamaliya-Debariya (SH-25), Dhrol-Badra Patiya (SH-25) and Badra-Patiya-Pipaliya (SH-6) have been included for development under Bharat Mala scheme as National Highways in principle. All the above road sections except Dwarka-Beyt –Dwarka are proposed under Hybrid Annuity mode (DBOT).

This information was given by Minister of State for Road Transport, Shipping and Highways and Chemical and fertilizers Shri Mansukh L Mandaviya in a written reply to a question in the Lok Sabha today.  He further added that total 72 number of proposals were received from Gujarat to repair National Highways during last three years. He said that the permission to undertake work has been granted on all sanctioned works. A consolidated fund of Rs 250 Crore for all sanctioned works has been allocated in 2017-18. A list of sanctioned works in 2017-18 is as follows- 

Sr. No NH No. Name of work Length

(Km)/

Sanctioned details
Date Cost
1. 64 Widening to 7.0 m to 10.0 m & Strengthening including geometric improvement and reconstruction of  old / weak structure of Existing road between KM 266/400 to 271/300 & 280/400 to 284/300 & Strengthening form Km 252/200 to  266/400 and Km 271/300 to  280/400 incl. Minor Bridges of NH-64 in the State of Gujarat.(Digas-Hasot-Rayma-Sunevkalla-Sahol-Vadoli-Kadrma Section) (Package-II) 27.54 28-07-2017 40.31
2. 64 Strengthening between Km 361/620 to 364/220 &368/520 to 370/620 on NH-64 (Kasbapar-Navsari-Aeru Road) 4.7 11.08.2017 4.35
3. 51 Construction of 4-lane Signature Bridge Between Dwarka and BeytDwarka and its approches in the State  of Gujarat on EPC mode on N.H-51 1 Nos. 21-08-2017 962.43
4. 953 Strengthening between Km 69/900 to  94/600 on NH-953 (Ahwa-Galkund-Saputara Section) including construction of Box-Culvert in place of old culverts. 24.5 22-08-2017 16.84
5. 168 Up gradation of new National Highway No. 168A to lane with paved side shoulder configuration including geometric improvement and reconstruction of old/ weak structures of between Km. 11/800 to 33/600 (Package-III) (Rajasthan/Gujarat boarder at Nenava-Dhanerasection) in the State of Gujarat 21.8 13-09-2017 82.93
6. 8 C

(147)

‘Development of 8-C (147) passing through Chiloda-Gandhinagar-Sarkhej Road Km.0/0 to 44/420 including ROB, Fly over, Under pass, Widening with service road, VUP,PUP and junction development for / up to  6 lanning in the state of Gujarat.” 44.042 19-12-2017 845.98
Total 1952.84

Related posts

3 comments

Leave a Comment

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More