New Delhi: In the year 2018-19, Coal India Limited (CIL) had supplied 491.54 Million Tonnes (MT) coal to power plants which was 8.2% more than the coal supplied in 2017-18. Singareni Collieries Company Limited (SCCL) supplied 55.3 MT coal to power plants in 2018-19 which was a growth of 3.6% over the same period of previous year. This has led to creation of a coal stock of 30.95 MT at the power plants as on 31.03.2019 which was sufficient for 18 days requirement. In 2018-19, the power plants of Tangedco have been supplied 23.26 MT coal from CIL with a growth of 3.5% over the supply of 22.49 MT in 2017-18. As on 16.06.2019, Tamil Nadu power plants have coal stock of 9.67 lakh tonne which is sufficient for 12 days requirement. At present, no power plant in Tamil Nadu is in critical/super critical category. Some of the numerous steps taken to augment coal supply to power plants are:
- The power plants in close vicinity of coal fields have been advised to move coal through road mode.
- For proper utilization of Goods sheds, the power plants have been advised to move coal through road-cum-rail mode.
- Optimal utilization of the captive modes of transport like, MGR, Belts, Ropes to move coal to the concerned power plants.
- Supply of coal to Power plants through rail mode is prioritized.
- Coal supplies to Power sector is monitored regularly by an Inter-Ministerial Sub-group comprising representative of Ministry of Power, Ministry of Coal, Ministry of Railways and Ministry of Shipping, Coal India Limited etc.